Available services

Projecto de instalação de duas bombas "Sulzer" LCP 45, na Central de Massarelos

Description level
Item Item
Reference code
PT/ADPRT/EMP/STCP/DM-MVI-GD/024/0109/00012
Title type
Formal
Date range
1946 Date is certain to 1950 Date is certain
Dimension and support
54 x 72
Extents
1 Folhas
Scope and content
Projecto de instalação de duas bombas "Sulzer" LCP 45, na Central de Massarelos, com várias cortes e planta.

Physical location
B/13/14/10-10.12
Original numbering
361
Language of the material
Por (português)
Physical characteristics and technical requirements
Regular com rasgões
Creation date
27/06/2012 00:00:00
Last modification
22/09/2023 12:50:23
Record not reviewed.